Do It Yourself Install

1: Lift Gate Delivery

2: Package Crates

3: Dimensions Staked Out

4: Looking Good

5: Excavate

6: Concrete Pad

7: Trench to Equipment Pad

8: Rebar in place

9: Equipment Pad Marked

10: Concrete Truck Arrives

11: Concrete Poured for Pool Pad

12: Concrete Poured for Equipment Pad

13: Trench Leading to Equipment Pad

14: Finished Concrete Pad for Pool

15: Finished Concrete Pad for Equipment

16: Lay Out Pool Panel Walls

17: Connect Corner Support Bracing

18: Connect Vertical Support Bracing

19: Lay Out Parts for Assembly

20: Start Fastening Together

21: Lunch Time

22: As Easy as it Looks

23: Fastening All Panels

24: Almost Finished with the Panels

25: Finished RiverPool Construction

26: Looks Great

27: Finished Structure with 8 inch Top Seat

28: View of Bands from Above

29: View of Housings for Lights and Jets

30: Plumbing for Hydro Jets

31: Jets and Light Installed

32: RiverPool Structure Completed

33: 1 inch Insulation Installed on Floor

34: 3/4 inch Foam Happy Bottom Installed

35: Ready for Liner

36: Liner Being Fitted

37: Ready for Jets and Lights

38: Covers Installed on Lights and Jets

39: Inside RiverPool Completed

40: Electrical in Place for Lights

41: Plumbing Completed

42: Ready to Finish Sides and Decking

43: Plywood Ready for Stone

44: Fill and Level Ground Around Pool

45: Stone Ready for Outside Walls

46: Stone Being Installed on Walls

47: Almost Finished.

48: Completed RiverPool

49: New Sod in Place

50: Almost Time for a Swim

51: Moving Motor and Hydraulic to Pad

52: Equipment Hooked Up and Ready

53: RiverPool with Jets Running

54: Beautiful

55: At Dusk with Lights and Jets On

56: RiverPool with Jets On

57: RiverPool Running at Dusk

58: Night Before the First Swim

59: First Swim in New RiverPool